Will 20K fix keep Krumkill open

NEW SCOTLAND — Krumkill Road could be open again by Dec. 1 if a temporary fix goes as planned.

It closed on Nov. 5, five days ahead of schedule, when the temporary lights controlling the one-lane strip of road that was narrowed after damage from Tropical Storm Irene failed in cold weather.

Superintendent of highways Darrell Duncan is hoping to build a 700-foot strip of road along the inside curve of the existing road so that it can stay open over the winter.  The tropical storm had eroded the ground beneath the original roadbed, making one lane impassable.  The town has acquired a license agreement from the people who own the property along the road on which the new lanes will be built.

Duncan is planning to pave next week.  He expects that the whole of the project will cost about $20,000.

More New Scotland News

  • The plan will now be folded into the town’s 2018 comprehensive plan and “used as a reference tool in the development, management, and protection of New Scotland’s natural resources, and in making future land use decisions,” the resolution adopting the plan states.

  • If approved, next year’s budget would represent a 0.15-percent increase over this year and a nearly 6 percent increase in the property tax levy.

  • “When they got here, the roof was on fire. They knocked it down fast. Nobody was home. So everybody’s safe and sound, just property damage,” Thomas Cascone, Voorheesville’s fire chief, told the media at the scene. 

The Altamont Enterprise is focused on hyper-local, high-quality journalism. We produce free election guides, curate readers' opinion pieces, and engage with important local issues. Subscriptions open full access to our work and make it possible.