Images 1

— From the California High-Speed Rail Authority

Installing four-quadrant gate systems at Main Street and Voorheesville Avenue would allow engineers to not have to blow their whistles as they travel past the two crossings because the quad gates are designed to block all lanes of traffic on both sides of the track. CSX says annual maintenance of the gate systems would be $50,000 and is looking for Voorheesville and Albany County to foot the bill.